The number before the work
- Parts and labour listed separately so nothing gets buried
- Options set side by side, each with its own figure
- An old laptop that locks up on the banking site? You hear the cost before we begin
- A written figure first if you want to show the family or the bookkeeper
- If the job grows, we stop and check the cost with you